Skip to content

Subansiri Lower Hydro Project: Unit-2 Starts Commercial Run

27 December 20251 min read
NATIONAL AFFAIRSSubansiri LowerHydro Project:Unit-2 StartsCommercial Run27 December 2025safalsetu.com

Why in the news

Union Minister Manohar Lal, joining virtually on 23 December 2025, opened the commercial running of the second 250 MW unit at the Subansiri Lower Hydroelectric Project.

Key facts

  • Unit started: Unit-2, capacity 250 MW.
  • Inaugurated by Union Minister Manohar Lal through a virtual event.
  • Expected output: roughly 7,422 million units of clean power every year.

About the project

  • It is a run-of-the-river scheme, which means it depends on the flow of the river and keeps only small pondage.
  • Water is carried through 8 Head Race Tunnels (HRTs).
ParameterDetail
ProjectSubansiri Lower Hydroelectric Project
MilestoneCommercial operation of Unit-2
Unit capacity250 MW
TypeRun-of-the-river, small pondage
Tunnels8 Head Race Tunnels

Exam angle

  • Date: 23 December 2025; person: Manohar Lal.
  • Remember: 250 MW, 7,422 million units, 8 HRTs.
  • Run-of-the-river means little water storage.

Test yourself

1. What is the capacity of Unit-2 of the Subansiri Lower Hydroelectric Project that began commercial operation?

Unit-2 is rated 250 MW.

2. The Subansiri Lower Hydroelectric Project is of which type?

It is described as run-of-the-river with small pondage.

3. Who virtually inaugurated commercial operation of Unit-2 on 23 December 2025?

Union Minister Manohar Lal inaugurated it virtually.