Skip to content

ISRO CE20 Cryogenic Engine Sea-Level Hot Test at 22 Tonnes

16 March 20261 min read
SCIENCE & TECHNOLOGYISRO CE20Cryogenic EngineSea-Level Hot Testat 22 Tonnes16 March 2026safalsetu.com

Why in the news

ISRO completed a sea-level hot test of its CE20 cryogenic engine in March 2026, a step towards a stronger upper stage for its heavy rocket.

Key facts

  • Engine: CE20 cryogenic engine.
  • Thrust level: 22 tonnes.
  • Duration: 165 seconds with a nozzle protection system.
  • Site: ISRO Propulsion Complex, Mahendragiri.
ParameterDetail
Test typeSea-level hot test
EngineCE20
Thrust22 tonnes
Burn time165 seconds
Linked stageC32 cryogenic stage
Launch vehicleLaunch Vehicle Mark-3

Significance

  • The upgrade is expected to improve payload capacity for upcoming missions.
  • Contributes to development of the C32 stage.

Exam angle

  • Engine name: CE20; stage: C32.
  • Vehicle: Launch Vehicle Mark-3.
  • Place of test: Mahendragiri.

Test yourself

1. Which engine did ISRO hot-test at sea level at 22-tonne thrust in March 2026?

The CE20 cryogenic engine was tested.

2. For how long did the CE20 sea-level hot test run?

The test lasted 165 seconds.

3. The CE20 test supports development of which cryogenic stage for the Launch Vehicle Mark-3?

It supports the C32 cryogenic stage.