Skip to content

India’s first removable solar panels between rail tracks, Varanasi

19 August 20251 min read
SCIENCE & TECHNOLOGYIndia’s firstremovable solarpanels between railtracks, Varanasi19 August 2025safalsetu.com

Why in the news

The Ministry of Railways has commissioned India’s first removable solar panel system laid between railway tracks. It was installed at Banaras Locomotive Works (BLW) in Varanasi on 15 August 2025.

Key facts

  • Length: 70 metres, with 28 panels.
  • Capacity: 15 KWp.
  • Site: Line No. 19 at BLW.
  • Design: panels sit between the tracks and can be lifted off for maintenance or emergencies.
  • Use of track space avoids the need for land acquisition.
ParameterValue
Panels28
Power density220 KWp per km
Energy density880 units per km per day
Estimated yearly output3.21 lakh units per km

About the purpose

This is a pilot, meant to use underused track space for clean power. It supports Indian Railways’ goal of net-zero carbon emissions and lower fossil fuel use.

Exam angle

  • Remember Varanasi (BLW), 70 m, 28 panels, 15 KWp.
  • Linked theme: green railways and net-zero targets.

Test yourself

1. Where was India's first removable solar panel system between railway tracks commissioned?

It was commissioned at Banaras Locomotive Works in Varanasi.

2. How many panels does the 70-metre installation have?

The system has 28 removable panels.

3. What is the installed capacity of the Varanasi track-solar system?

The installed capacity is 15 KWp.

Sources: Insights on India - UPSC Current Affairs 19 August 2025, AffairsCloud - Current Affairs 19 August 2025