Skip to content

NISAR Satellite: NASA-ISRO Radar Mission Goes Operational

6 November 20251 min read
SCIENCE & TECHNOLOGYNISAR Satellite:NASA-ISRO RadarMission GoesOperational6 November 2025safalsetu.com

Why in the news

ISRO Chairman V. Narayanan said NISAR would be formally declared operational on 7 November 2025.

Key facts

  • Full name: NASA-ISRO Synthetic Aperture Radar; launched from Satish Dhawan Space Centre (GSLV-F16).
  • Called the costliest Earth observation satellite ever built.
  • Scans most land and ice twice in 12 days.
FeatureBenefit
Dual-frequency SARL-band plus S-band in one satellite
12-metre mesh antennaPrecise imaging
SweepSAR242 km swath, 12-day revisit
ResolutionChanges below 1 cm
CoverageDay-night, all-weather

Objectives and ISRO’s share

  • Track land deformation, glaciers, ecosystems, soil moisture and coasts; aid disaster response and climate studies.
  • ISRO built the S-band radar and a modified I-3K bus, and runs ground operations.

Exam angle

  • L-band: NASA; S-band: ISRO.
  • Revisit cycle: 12 days.

Test yourself

1. In the NISAR satellite, which radar band is contributed by ISRO?

NASA supplies the L-band radar; ISRO developed the S-band system.

2. NISAR was launched in July 2025 on which ISRO rocket?

It flew on a GSLV (GSLV-F16).

3. What is the NISAR mission's revisit cycle for covering most land and ice surfaces?

NISAR monitors most land and ice twice within 12 days.