Skip to content

Kaziranga Elevated Corridor: ₹6,957 Crore Project Begins

21 January 20261 min read
NATIONAL AFFAIRSKazirangaElevated Corridor:₹6,957 CroreProject Begins21 January 2026safalsetu.com

Why in the news

Prime Minister Narendra Modi began work on a major highway project at Kaliabor in Assam and flagged off two Amrit Bharat trains by video link. The event came before elections in the state.

Key facts

  • Project: Kaziranga elevated corridor.
  • Cost: ₹6,957 crore.
  • Length: 86 km, a four-lane National Highway.
  • Elevated section: 35 km running through Kaziranga National Park.
  • Trains: two Amrit Bharat trains flagged off virtually.

About Kaziranga National Park

FeatureDetail
LocationAssam, in Golaghat and Nagaon districts
OriginReserve forest in 1905
National Park status1974
World Heritage Site1985 (UNESCO)

Exam angle

  • Project length and elevated portion: 86 km and 35 km.
  • Park districts: Golaghat and Nagaon.
  • Declared a National Park in 1974.

Test yourself

1. What is the total length of the Kaziranga elevated corridor project?

The corridor is 86 km long, with a 35 km elevated stretch.

2. Kaziranga National Park lies in which pair of districts of Assam?

The park is in Golaghat and Nagaon districts.

3. In which year was Kaziranga declared a National Park?

It became a National Park in 1974, after being a reserve forest in 1905.