Skip to content

Kavach 4.0 Goes Live on Mathura-Kota Rail Section

1 August 20251 min read
SCIENCE & TECHNOLOGYKavach 4.0 GoesLive onMathura-Kota RailSection1 August 2025safalsetu.com

Why in the news

Indian Railways commissioned its home-grown Kavach 4.0 on the Mathura-Kota stretch of a high-density corridor.

Key facts

  • An indigenous Automatic Train Protection (ATP) system that controls speed and brakes by itself in emergencies.
  • Built under Atmanirbhar Bharat; RDSO approval July 2024; first used on South Central Railway in 2018.
  • Rated SIL 4; works in fog, with information shown on the loco dashboard.
  • Needs RFID tags every 1 km, telecom towers, optical fibre and station systems; Loco and Station Kavach exchange data live.

Significance

  • First indigenous train-safety initiative since Independence.
  • Supports Make in India and Digital India; major routes to be covered in 6 years.

Exam angle

  • System type: ATP; rating: SIL 4; approving body: RDSO.

Test yourself

1. Which safety rating does Kavach 4.0 carry, as noted in the notes on the indigenous train protection system?

Kavach 4.0 is designed to Safety Integrity Level 4, the highest global rating.

2. On which railway section was Kavach 4.0 commissioned in this news?

The system went live on the Mathura-Kota stretch of the Delhi–Mumbai route.

3. Kavach 4.0 was approved in May 2025 for trains running up to what speed?

The May 2025 approval covers trains up to 160 km/h.