Skip to content

India’s Green Hydrogen Potential: FICCI-EY Report Findings

22 August 20251 min read
REPORTS & INDEXESIndia’s GreenHydrogenPotential: FICCI-EYReport Findings22 August 2025safalsetu.com

Why in the news

A joint FICCI and EY study links cost and infrastructure fixes to net-zero goals.

Key facts

  • Made by electrolysis of water using renewable energy; zero-emission fuel for steel, fertilisers, mobility and shipping.
  • 5 MMT by 2030 needs 125 GW of renewable capacity.
  • Pilots: ₹208 crore; 37 hydrogen vehicles; 9 refuelling stations due in 18-24 months.
  • Cost is nearly 2x grey hydrogen.

Challenges

  • Capex, transmission losses and fossil fuel subsidies.
  • Missing pipelines and storage.
  • No assured industrial offtake; EU, Japan and South Korea building import hubs.

Recommendations

  • Redirect fossil subsidies; mandate use in key sectors.
  • Carbon tax and long-term demand contracts.

Exam angle

  • Mission year 2023; outlay ₹19,744 crore.
  • 2030 goals: 5 MMT, 125 GW.

Test yourself

1. What annual green hydrogen production target does India have for 2030 under the mission?

The target is 5 MMT annual production by 2030.

2. What is the outlay of the National Green Hydrogen Mission (2023)?

The mission outlay is ₹19,744 crore.

3. According to the FICCI-EY report, what share of the global green hydrogen market could India capture?

It says India could capture 10% of the global market.