Skip to content

Noida International Airport at Jewar: Phase I Inaugurated

28 March 20261 min read
NATIONAL AFFAIRSNoida InternationalAirport at Jewar:Phase I Inaugurated28 March 2026safalsetu.com

Why in the news

Prime Minister Narendra Modi inaugurated the first phase of Noida International Airport at Jewar in Uttar Pradesh on 28 March 2026 as a public-private partnership project.

Key facts

  • Location: Jewar, Gautam Buddha Nagar district, Uttar Pradesh.
  • Cost of Phase I: about Rs 11,200 crore.
  • Model: public-private partnership; the concession runs 40 years.
  • Runway: one runway of 3,900 m, suited to wide-body aircraft.
  • Capacity: 12 million passengers per annum in Phase I.

Airport profile

ItemDetail
OperatorYamuna International Airport Pvt Ltd (YIAPL)
ParentZurich Airport International AG, Switzerland
Foundation stone25 November 2021
Long-term capacity70 million passengers a year
IATA codeDXN

Background

The airport is planned to grow through four phases, with a total projected investment of Rs 29,561 crore and, eventually, six runways. The Aerodrome licence for the airport was granted on 6 March 2026, shortly before the inauguration.

Exam angle

  • Remember the operator nationality (Switzerland), the PPP format and the 3,900 m runway.
  • Phase I capacity of 12 million versus the ultimate 70 million is a common comparison.
  • Location is in Uttar Pradesh, not Haryana or Delhi.

Test yourself

1. Noida International Airport is located at which place?

The airport is at Jewar in Gautam Buddha Nagar district, Uttar Pradesh.

2. Noida International Airport is developed with which foreign operator group?

The concessionaire is a subsidiary of Zurich Airport International AG, Switzerland.

3. What is the length of the runway in Phase I of Noida International Airport?

Phase I has one 3,900 m runway.

Sources: Testbook, 27 March 2026 current affairs, Wikipedia: Noida International Airport