Skip to content

PMGSY-IV Launch in Odisha: Phases and Digital Tools

4 May 20261 min read
GOVERNMENT SCHEMESPMGSY-IV Launchin Odisha: Phasesand Digital Tools4 May 2026safalsetu.com

Why in the news

PMGSY-IV was launched in Odisha in May 2026, with Rayagada chosen for the state-level event. The phase aims at saturation connectivity, reaching difficult Eastern Ghats terrain so that no habitation stays isolated.

Key facts

  • PMGSY-IV period: 2024 to 2029.
  • Outlay: ₹70,125 crore.
  • Targets: 25,000 unconnected habitations and 62,500 km of new roads.
  • Launch district in Odisha: Rayagada.

Phase-wise journey

PhaseYearFocus
PMGSY-I2000All-weather links to unconnected habitations of 500+ people (plains) and 250+ (hilly/tribal areas)
PMGSY-II2013Consolidation: 50,000 km of existing rural roads upgraded
RCPLWEA2016Left Wing Extremism affected areas, 44 districts, for security mobility and development
PMGSY-III2019Through Routes and Major Rural Links to GrAMs, higher secondary schools and hospitals
PMGSY-IV2024-2029Remaining unconnected habitations, new roads

Accountability tools

  • OMMAS: real-time tracking of physical and financial progress.
  • e-MARG: performance-linked maintenance; contractors get paid during the 5-year Defect Liability Period only if the road is kept in shape.
  • GPS tracking: compulsory since 2022 for machinery and vehicles.

Key terms

  • Habitation: a population cluster whose parts are not split by natural or man-made barriers.
  • All-weather road: usable in every season, with proper drainage and culverts to withstand monsoons.
  • Centrally Sponsored Scheme: cost shared by Centre and States, implementation by the State.

Exam angle

  • Phase-year matching: I (2000), II (2013), RCPLWEA (2016), III (2019), IV (2024-2029).
  • Monitoring tools: OMMAS, e-MARG, GPS tracking.
  • Rural Development Minister named as of May 2026: Shivraj Singh Chouhan.

Test yourself

1. PMGSY-IV has an outlay of ₹70,125 crore. How many unconnected habitations does it aim to connect?

The latest phase targets 25,000 habitations through 62,500 km of new roads.

2. Which platform under PMGSY ensures contractors are paid in the 5-year Defect Liability Period only if roads are maintained?

e-MARG is the performance-based maintenance platform.

3. From which Odisha district was PMGSY-IV launched at state level?

Rayagada was chosen for the state-level launch.