Pune Metro Line 3 inaugurated; Phase-II worth ₹13,500 crore launched
Why in the news
On 3 November 2026, Prime Minister Narendra Modi, through video conferencing, inaugurated Pune Metro Line 3 (Pink Line) and laid the foundation stone of Pune Metro Phase-II. The projects together are worth about ₹21,800 crore.
Key facts
- Line 3 (Pink Line): about 23 km from Maan to District Court Metro station, connecting the Hinjewadi IT hub with Shivajinagar via Baner and Balewadi.
- Cost: over ₹8,300 crore; built through a collaboration of PMRDA and the Tata Group.
- Women operators: every train operator on the line will be a woman, described as a first-of-its-kind initiative.
- Solar power: around 30% of the line’s electricity needs to be met from solar energy.
- Stations: 23 in all, with 17 opening first; passenger service from 4 November 2026; fares ₹12 to ₹62 (ETV Bharat).
- Interchanges in Phase-II: Swargate, Nal Stop and Kharadi Bypass, also linked to intercity bus services.
Pune Metro Phase-II (about ₹13,500 crore)
| Line | Route | Length |
|---|---|---|
| 2A | Vanaz – Chandani Chowk | about 12.75 km (2A and 2B together) |
| 2B | Ramwadi – Vitthalwadi | included with 2A |
| 4 | Kharadi – Khadakwasla | about 25.52 km |
| 4A | Nal Stop – Manik Baug | 6.12 km |
About the project
Phase-II will serve areas such as Kharadi, Magarpatta, Hadapsar, Swargate, Manik Baug, Nanded City, Pune Cantonment and Warje, improving east-west and south-bound links in the city.
Exam angle
- Pink Line = Pune Metro Line 3, Hinjewadi to Shivajinagar, operated entirely by women.
- Total value about ₹21,800 crore; Line 3 over ₹8,300 crore; Phase-II about ₹13,500 crore.
- Line 4 (Kharadi–Khadakwasla) is the longest Phase-II corridor at about 25.52 km.